Kilcock Primary Care Centre Complete!

As part of the PPP Primary Health Care build, Kilcock Primary Health Care Centre has reached service commencement status. This is one of 5 Primary Care sites within the bundle that Green Energy Solutions staff acted as design-build M&E consultants. Other sites include Carrick on Suir, Dungarvan, Waterford, Wexford all of which are due to open later this year.

Kilcock Primary Care will take the strain off the hospital system by providing community-based care. The services provided include outpatient consultants, GP surgeries, wound treatment, community nursing, mental health services, physiotherapy services, to name a few.

NLCE_Kilcock_Primary_Care_Centre

Our engineers designed this building to BIM level 2 standards which will allow the HSE reap the benefits of integrating it into their FM providers system. The building is predominantly naturally ventilated and achieves an A3 BER rating. A sedum roof adds to the green credential of this building!

The M&E services are designed with full flexibility to allow varying operating hours for all department within the building. This prevents energy wastage in the overall building. The BMS and energy monitoring systems monitors all M&E systems and reports to a central server that can be accessed remotely by the FM providers.